CM Commitments

Anjaw

Name of Scheme
: Maintenance/construction of 16 MW Halia Pani SHP, Anjaw
Estimated Amount
:
Current Status
: Approved for Rs. 15.00 Cr under RIDF 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:45pm

Changlang

Name of Scheme
: Mini Stadium, Jairampur
Estimated Amount
: Rs. 5.00 Cr
Current Status
: The proposed scheme is placed in the priority list of NEC2012-13 for approval of GOI
Remarks
:
Last Updated
: 21-07-2013 01:48am

Name of Scheme
: Infrastructure for Moh Mol Festival ground at Changlang.
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13 ( Multipurpose ground at Changlang)
Remarks
:
Last Updated
: 21-07-2013 01:48am

Name of Scheme
: C/O Changlang-Khimiyang road
Estimated Amount
:
Current Status
: Ongoing project under NLCPR, Rs. 7.58 Cr released out of Rs. 8.59 Cr.
Remarks
:
Last Updated
: 21-07-2013 01:49am

Name of Scheme
: Water Supply project at Changlang
Estimated Amount
:
Current Status
: Rs. 15.00 Cr approved under RIDF 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:49am

Name of Scheme
: Creation of CO HQ at Lower Belt of Changlang South Constituency
Estimated Amount
:
Current Status
:
Remarks
: DC to submit proposal
Last Updated
: 21-07-2013 01:49am

Name of Scheme
: Extension of Circuit House at Changlang
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13 ( C/O New Circuit House at Changlang
Remarks
:
Last Updated
: 21-07-2013 01:50am

Name of Scheme
: ADC Office building at Jairampur
Estimated Amount
: Rs. 2.37 Cr
Current Status
: Concept paper amounting to Rs. 2.37Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:50am

Name of Scheme
: Convention hall with 500 capacity at Terit Nagar, Changlang
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:51am

Name of Scheme
: Infrastructure development of Administrative Hq, Vijonagar andC/O of Circuit house at Vijoynagar
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 1.00 Cr each submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 02:13am

Dibang Valley

Name of Scheme
: District Secretariat, Anini
Estimated Amount
: Rs. 10.00 Cr
Current Status
:
Remarks
: Will be taken up in Next Financial Year
Last Updated
: 21-07-2013 01:38am

Name of Scheme
: C/O Teachers Quarter
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-
Remarks
:
Last Updated
: 21-07-2013 01:39am

Name of Scheme
: C/O DC residence and staff quarters
Estimated Amount
: Rs. 1.00 Cr
Current Status
:
Remarks
: Will be taken up in Next Financial Year
Last Updated
: 21-07-2013 01:41am

Name of Scheme
: Porter Track from Malinye to Athu-Popu
Estimated Amount
: Rs. 20.00 Lakhs
Current Status
:
Remarks
: Will be taken up in Next Financial Year
Last Updated
: 21-07-2013 01:42am

Name of Scheme
: C/O outdoor stadium
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Will be taken up in Next Financial Year
Remarks
:
Last Updated
: 21-07-2013 01:42am

East Kameng

Name of Scheme
: C/O Bameng-Lada road
Estimated Amount
:
Current Status
:
Remarks
: Approved under PMGSY.
Last Updated
: 21-07-2013 12:40am

Name of Scheme
: For Clearance of Liabilities to the contractors of Bameng-Lada
Estimated Amount
: Rs. 3.00 Cr
Current Status
: Amount released to PWD under Normal Plan during 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:43am

Name of Scheme
: Bameng-Lapung road
Estimated Amount
:
Current Status
:
Remarks
:
Last Updated
: 21-07-2013 12:43am

Name of Scheme
: 1.5MW hydro-power project on Pachuk river
Estimated Amount
:
Current Status
:
Remarks
: Survey and investigation to be carried out
Last Updated
: 21-07-2013 12:44am

Name of Scheme
: Development of dropping ground and play ground at Lada
Estimated Amount
: Rs. 2.00Cr
Current Status
: Concept paper of the project amounting to Rs. 1.00Cr submitted to Planning Commission for funding under SPA, 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:45am

Name of Scheme
: C/O ADC office infrastructure in Chayangtajo
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Concept paper of the project amounting to Rs. 1.00Cr submitted to Planning Commission for funding under SPA, 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:45am

Name of Scheme
: C/O residential quarters at ADC Hq, Chayangtajo
Estimated Amount
: Rs. 1.50Cr
Current Status
: Concept paper of the project amounting to Rs. 1.00Cr submitted to Planning Commission for funding under SPA, 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:46am

Name of Scheme
: Infrastructure development of newly created Passa valley Circle Hq. at TajaHapa, Rilloh (Ph-I)
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Concept paper of the project amounting to Rs. 1.00 Cr submitted to Planning Commission to be taken up under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:47am

Name of Scheme
: C/O Circuit House
Estimated Amount
: Rs.1.00 Cr
Current Status
: Concept paper of the project amounting to Rs. 1.00 Cr submitted to Planning Commission to be taken up under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:47am

Name of Scheme
: C/O Multipurpose stadium at Rilloh
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Concept paper of the project amounting to Rs. 1.00 Cr submitted to Planning Commission to be taken up under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:48am

Name of Scheme
: C/O outdoor stadium at Seppa
Estimated Amount
:
Current Status
: Rs. 2.11 Cr proposed under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:48am

East Siang

Name of Scheme
: C/O community hall, Pasighat
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Approved under SPA 2011-12 and released to department of Art and Culture
Remarks
:
Last Updated
: 21-07-2013 01:31am

Name of Scheme
: C/O Tolon and Poklek bridge, Pasighat
Estimated Amount
: Rs. 21.00 Cr
Current Status
: The project has been retained for Rs 16.00 Cr under NLCPR 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:31am

Name of Scheme
: Immediate Maintenance and repairing of Govt. Hr. Sec. School, Pangin
Estimated Amount
: Rs. 20.00 Lakhs
Current Status
: Amount provided under Normal Plan 2011-12 under PWD (housing)
Remarks
:
Last Updated
: 21-07-2013 01:32am

Name of Scheme
: Infrastructure development at Govt. Hr. Sec. School, Pangin
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:33am

Name of Scheme
: Multipurpose Hall for Adi Bane Kebang, Pasighat
Estimated Amount
: Rs. 5.00 Cr
Current Status
: Concept paper amounting to Rs. 2.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:33am

Kurung Kumey

Name of Scheme
: C/O Play ground for Government Secondary School, Tali
Estimated Amount
: Rs. 1.00 CR
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:16am

Name of Scheme
: C/O permanent Circle Office at Tali
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Rs. 1.00 Cr provided under SPA 2011-12
Remarks
:
Last Updated
: 21-07-2013 01:17am

Name of Scheme
: C/O Circuit House at Palin.
Estimated Amount
: Rs. 3.00 Cr
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:18am

Name of Scheme
: Infrastructure development for ADC Hq, Pania
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Concept paper amounting to Rs. 2.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:19am

Name of Scheme
: Up-gradation of Palin CO Hq to EAC Hq.
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Approved under SPA 2011-12 and amount released to PWD (Public Works)
Remarks
:
Last Updated
: 21-07-2013 01:19am

Name of Scheme
: Grant for Tea cultivation
Estimated Amount
: Rs. 1.00 Cr
Current Status
: The proposed scheme is included in the priority list of NEC, 2012-13 for GOI approval
Remarks
:
Last Updated
: 21-07-2013 01:20am

Name of Scheme
: Approach road to Circuit House, Koloriang and C/o conference hall at Circuit house, Koloriang
Estimated Amount
:
Current Status
: RS. 1.00 CR approved for Extension of Circuit House with conference hall and C/o approach road to Circuit House Koloriang under SPA and fund released to PWD.
Remarks
:
Last Updated
: 21-07-2013 01:20am

Name of Scheme
: Infrastructure development of New SDO HQ at Sangram
Estimated Amount
: Rs. 5.00 Cr
Current Status
: Concept paper amounting to Rs. 2.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:21am

Name of Scheme
: Creation of CO Hq at Nyobia
Estimated Amount
:
Current Status
:
Remarks
: DC Kurung Kumey to submit proposal.
Last Updated
: 21-07-2013 01:22am

Name of Scheme
: C/O road from Sangram to Parisi
Estimated Amount
:
Current Status
: Ongoing scheme, Rs. 78.12 Lakh released during 2011-12
Remarks
:
Last Updated
: 21-07-2013 01:23am

Name of Scheme
: C/o outdoor stadium at Sangram
Estimated Amount
:
Current Status
: Rs. Rs. 2.77 Cr. released under SPA for construction of stadium at Four District Hq.
Remarks
:
Last Updated
: 21-07-2013 01:23am

Lohit

Name of Scheme
: Mini Secretariat Ph-I, Tezu
Estimated Amount
: Rs. 10.00 Cr
Current Status
: An amount of Rs. 5.55 Cr released under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:45am

Name of Scheme
: C/O bridges/culverts on NH52 BRTF Road to Bekhuliang
Estimated Amount
:
Current Status
: Ongoing project, Rs.287.18 Lakhs allotted during 2011-12
Remarks
:
Last Updated
: 21-07-2013 01:45am

Name of Scheme
: Creation of infrastructure at Namgo model village for celebration of Shapawng Yawng Manau Poi as Tourism Festival
Estimated Amount
: Rs 3.00 Cr
Current Status
: Concept paper amounting to Rs. 1.50 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:46am

Lower Dibang Valley

Name of Scheme
: Water Supply Project at Roing
Estimated Amount
: Rs. 10.00 Cr
Current Status
: An amount of Rs. 5.55 Cr released under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:43am

Name of Scheme
: Mini Secretariat, Roing
Estimated Amount
:
Current Status
: Rs. 5.5 Cr Ph-I Under SPA 2012-13
Remarks
: Foundation stone laid
Last Updated
: 21-07-2013 01:44am

Lower Subansiri

Name of Scheme
: C/O road from Pine-groove to Siro (outer Ring Road)in Ziro
Estimated Amount
: Rs. 10.00 Cr
Current Status
: Rs. 10.00 Cr approved under RIDF 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:06am

Name of Scheme
: Relief Assistance for crop damage in Ziro Valley
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Rs 2.00 Cr released to DC Ziro
Remarks
:
Last Updated
: 21-07-2013 01:07am

Name of Scheme
: C/O outdoor stadium at Dree ground
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:07am

Name of Scheme
: Mini Secretariat at Raga AD Hq
Estimated Amount
: Rs. 5.00 Cr
Current Status
: Concept paper amounting to Rs. 2.00 Cr submitted to Planning Commission for funding under SPA 2012-13 for PH-I
Remarks
:
Last Updated
: 21-07-2013 01:08am

Papumpare

Name of Scheme
: Development of Sports infrastructure across the state
Estimated Amount
: Rs.20.00 Cr
Current Status
: Approved under SPA ,2011-12 and released to Sports department
Remarks
:
Last Updated
: 21-07-2013 12:53am

Name of Scheme
: Enhancement of TTMSLFT (Tadar Tang Memorial State Level Football Tournament) grant.
Estimated Amount
: Rs. 12.00 Lakhs
Current Status
: Enhanced from Rs. 8.00 Lakhs to Rs. 12.00 Lakhs
Remarks
:
Last Updated
: 21-07-2013 12:52am

Name of Scheme
: C/O Circuit house at Kimin
Estimated Amount
: Rs. 2.00 Cr
Current Status
: The amount for the project released to PWD under TFC during 2011-12
Remarks
:
Last Updated
: 21-07-2013 12:53am

Name of Scheme
: C/O Auditorium at PTC with 1000 capacity
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Concept paper of the project amounting to Rs. 2.00 Cr submitted to Planning Commission to be taken up under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:54am

Name of Scheme
: Improvement of road from Mabb to Deb village (2.5Kms)
Estimated Amount
: Rs. 3.00 Cr
Current Status
: Concept paper of the project amounting to Rs. 1.50 Cr submitted to the Planning Commission to be undertaken under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:55am

Name of Scheme
: Suspension bridge over river Lebia
Estimated Amount
:
Current Status
: RWD existing steel plates and wires to be shifted from Deb to the proposed site. No fund provided.
Remarks
:
Last Updated
: 21-07-2013 12:56am

Name of Scheme
: Mini Secretariat at Naharlagun
Estimated Amount
: Rs. 10.00 Cr
Current Status
: Rs. 5.55 Cr released by MOF as Ph-I under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:57am

Name of Scheme
: By-pass road from Model Village via Helipad to general Hospital Naharlagun
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Concept paper of the project amounting to Rs. 2.00Cr submitted to Planning Commission for funding under SPA, 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:57am

Name of Scheme
: Widening and completion of Jullang road
Estimated Amount
: Rs. 12.00 Cr
Current Status
: An amount of Rs. 11.11 Cr has been released by MOF under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:58am

Name of Scheme
: C/O CC sector roads
Estimated Amount
: Rs.25.00Cr
Current Status
: An amount of Rs. 11.11 Cr has been released by MOF under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:59am

Name of Scheme
: Bridge near Pachin Village
Estimated Amount
:
Current Status
: Rs. 6.00 Cr proposed under RIDF-XVIII
Remarks
:
Last Updated
: 21-07-2013 12:59am

Name of Scheme
: Ex-gratia to the family of Late Bablu Nath who was washed away by flood in Sunpura, Lohit District during rescue operation.
Estimated Amount
:
Current Status
: Rs. 1.50 Lakhs released.
Remarks
:
Last Updated
: 21-07-2013 01:00am

Name of Scheme
: Extension of School building for hearing impaired School
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:00am

Name of Scheme
: Township Road, Tarasso
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:01am

Name of Scheme
: C/o road from Pappu Nallah via Donyi Polo Mission School
Estimated Amount
: Rs. 10.00 Cr
Current Status
: Rs. 10.00 Cr approved under RIDF 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:02am

Name of Scheme
: Sports activities in panchayat level
Estimated Amount
: Rs 2.00 Cr
Current Status
: Provided Rs. 70.00 Lakhs as State share from Normal Plan for PAYYKA during 2011-12
Remarks
:
Last Updated
: 21-07-2013 01:03am

Tawang

Name of Scheme
: Zemithang circle up gradation
Estimated Amount
:
Current Status
:
Remarks
: DC Tawang to submit proposal
Last Updated
: 21-07-2013 12:15am

Name of Scheme
: New CO HQ. at Soula Laste
Estimated Amount
:
Current Status
:
Remarks
: DC Tawang to submit proposal
Last Updated
: 21-07-2013 12:17am

Name of Scheme
: Multipurpose auditorium at Lumla
Estimated Amount
: Rs. 1.50 Cr
Current Status
: Concept paper of the project amounting to Rs.1.50 crore submitted to Planning Commission for funding under SPA, 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:17am

Name of Scheme
: Dolma Lhakang and Guru Padmasambhava Project
Estimated Amount
:
Current Status
:
Remarks
: Will be taken up NFY
Last Updated
: 21-07-2013 12:19am

Name of Scheme
: Officers Residential Complex
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Concept paper of the project amounting to Rs.2.00 crore submitted to Planning Commission for funding under SPA, 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:23am

Tirap

Name of Scheme
: Khonsa Township RCC road with drainage
Estimated Amount
:
Current Status
: Rs 11.11 Cr under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:55am

Name of Scheme
: Mini Secretariat-Ph-I, Khonsa
Estimated Amount
:
Current Status
: Rs. 5.55 Cr under SPA 2012-13 approved fund to be released.
Remarks
:
Last Updated
: 21-07-2013 01:55am

Name of Scheme
: C/O Multipurpose Hall at Khonsa
Estimated Amount
: Rs. 1.5 Cr
Current Status
: Proposed under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:56am

Upper Siang

Name of Scheme
: Declare Mariyang as Urban Town
Estimated Amount
:
Current Status
:
Remarks
: Will be taken up NFY
Last Updated
: 21-07-2013 01:34am

Name of Scheme
: Establishment of Polytechnic, Mariyang
Estimated Amount
:
Current Status
:
Remarks
: Will be taken up NFY
Last Updated
: 21-07-2013 01:34am

Name of Scheme
: Up gradation of CO Hq, Mariyang
Estimated Amount
:
Current Status
:
Remarks
: DC to submit proposal
Last Updated
: 21-07-2013 01:35am

Name of Scheme
: C/o Solung Rostrum
Estimated Amount
: Rs. 20.00 Lakhs
Current Status
:
Remarks
: Will be taken up NFY
Last Updated
: 21-07-2013 01:37am

Name of Scheme
: Fund for renovation of School Auditorium
Estimated Amount
:
Current Status
:
Remarks
: Detail report yet to be submitted
Last Updated
: 21-07-2013 01:37am

Upper Subansiri

Name of Scheme
: Mini Secretariat at Daporijo with road connectivity Ph-I
Estimated Amount
: Rs.10.00 Cr
Current Status
: An amount of Rs. 5.55 Cr released under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:11am

Name of Scheme
: Government Degree College, Daporijo
Estimated Amount
: Rs. 5.00 Cr
Current Status
: Concept paper amounting to Rs. 2.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:12am

Name of Scheme
: C/O RCC double storied Circuit House building, Daporijo
Estimated Amount
: Rs. 1.50 Cr
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13 for reconstruction of Circuit House, Daporijo
Remarks
:
Last Updated
: 21-07-2013 01:12am

Name of Scheme
: Town beautification of Taliha Circle Hq and Payeng Circle Hq
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 2.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:14am

Name of Scheme
: SDO office infrastructure and staff quarters, Baririjo
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:15am

Name of Scheme
: Infrastructure development for ADC HQ, Dumporijo
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:15am

Name of Scheme
: Rostrum/Mini stadium after late Ratan Tama
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:16am

West Kameng

Name of Scheme
: Construction and renovation of Cultural Centre, Bomdila
Estimated Amount
: Rs. 1.50 Cr.
Current Status
: Concept paper of the project amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:24am

Name of Scheme
: Extension of Dukhang ( Main prayer Hall), Bomdila
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Approved under SPA, 2012-13 and released to Department of Karmik and Adyatmik
Remarks
:
Last Updated
: 21-07-2013 12:25am

Name of Scheme
: Fund for library to placed in DoKA
Estimated Amount
: Rs. 1.25 Cr
Current Status
: Rs.1.00Cr Approved under SPA, 2012-13 and released to Department of Karmik and Adyatmik.
Remarks
:
Last Updated
: 21-07-2013 12:26am

Name of Scheme
: Development of Budha Park, Bomdila
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Rs.1.00Cr Approved under SPA, 2012-13 and released to Department of Karmik and Adyatmik.
Remarks
:
Last Updated
: 21-07-2013 12:26am

Name of Scheme
: Establishment of Police out post at Nafra
Estimated Amount
:
Current Status
:
Remarks
: To be taken up in Cabinet
Last Updated
: 21-07-2013 12:28am

Name of Scheme
: RCC bridge over Bichom River
Estimated Amount
:
Current Status
:
Remarks
: Will be taken under RIDF
Last Updated
: 21-07-2013 12:33am

Name of Scheme
: Tourist lodge at Nafra
Estimated Amount
:
Current Status
:
Remarks
: Will be taken up in NFY
Last Updated
: 21-07-2013 12:34am

Name of Scheme
: Flood control in Nafra Township
Estimated Amount
: Rs. 1.00 Cr
Current Status
:
Remarks
:
Last Updated
: 21-07-2013 12:35am

Name of Scheme
: Community Health Center Building, Kalaktang
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Concept paper of the project amounting to Rs. 2.00Cr submitted to Planning Commission for funding under SPA? 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:36am

Name of Scheme
: Approach Road to ADC HQ, Kalaktang
Estimated Amount
: Rs. 5.00 Cr
Current Status
: Rs. 5.00 Cr approved by government to be taken up under RIDF during 2012-13
Remarks
:
Last Updated
: 21-07-2013 12:39am

Name of Scheme
: Road from Balemu to CO Hq to Bhairavkund
Estimated Amount
:
Current Status
:
Remarks
: NEC
Last Updated
: 21-07-2013 12:37am

Name of Scheme
: Creation of CO HQ at Morshing
Estimated Amount
:
Current Status
:
Remarks
: DC Bomdila to submit proposal
Last Updated
: 21-07-2013 12:38am

Name of Scheme
: Domkhorong Hydro Electric Project
Estimated Amount
:
Current Status
:
Remarks
: Will be taken up under RIDF
Last Updated
: 21-07-2013 12:39am

Name of Scheme
: Relief assistance for fire mishap in Kalaktang
Estimated Amount
:
Current Status
: Rs. 3.17 Lakhs sanctioned and provided.
Remarks
:
Last Updated
: 21-07-2013 12:40am

West Siang

Name of Scheme
: Protection/preservation and infrastructure development of archaeological Museum and monuments, Malinithan
Estimated Amount
: Rs. 5.00 Cr
Current Status
: The projects amounting to Rs. 5.00 Cr have been submitted to NEC for sanctioning
Remarks
:
Last Updated
: 21-07-2013 01:24am

Name of Scheme
: Improvement & rehabilitation of Likabali township road (8.00KMs)
Estimated Amount
: Rs 2.00 Cr
Current Status
: During 2011-12 an amount of Rs. 1.50 Cr provided to PWD under SPA
Remarks
:
Last Updated
: 21-07-2013 01:25am

Name of Scheme
: Expansion and construction of well equipped Circuit House, Aalo
Estimated Amount
: Rs 2.00 Cr
Current Status
: Approved under SPA 2011-12 and fund released to PWD
Remarks
:
Last Updated
: 21-07-2013 01:26am

Name of Scheme
: Establishment of Paktu heritage Center, Aalo
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Approved under SPA during 2011-12 and required amount released to Art and Culture department.
Remarks
:
Last Updated
: 21-07-2013 01:27am

Name of Scheme
: C/O security wall around Govt. H.S. School, Aalo
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Rs. 1.00 Cr under SPA 201-12 was provided to the Department of School Education.
Remarks
:
Last Updated
: 21-07-2013 01:28am

Name of Scheme
: Renovation of Gonpa, Mechuka
Estimated Amount
: Rs.10.00 Lakhs
Current Status
: Amount provided from normal Plan during 2011-12 under PWD (housing)
Remarks
:
Last Updated
: 21-07-2013 01:29am

Name of Scheme
: Infrastructure development for CO Hq, Kangku
Estimated Amount
: Rs. 1.00 Cr
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:29am

Name of Scheme
: Infrastructure for District Hospital Aalo,
Estimated Amount
: Rs. 2.00 Cr
Current Status
: Concept paper amounting to Rs. 2.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 01:30am

Longding

Name of Scheme
: New Circuit House, Longding
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 1.00 Cr submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 02:16am

Name of Scheme
: Mini Stadium, Longding
Estimated Amount
:
Current Status
: The proposed scheme amounting to Rs. 2.00 Cr included in the priority list of NEC 2012-13 for approval of GOI
Remarks
:
Last Updated
: 21-07-2013 02:17am

Name of Scheme
: C/O CC township road, Longding
Estimated Amount
:
Current Status
: An amount of Rs. 11.11 Cr released under SPA 2012-113
Remarks
:
Last Updated
: 21-07-2013 02:17am

Name of Scheme
: Inspection Bunglow, Lawnu
Estimated Amount
:
Current Status
: Concept paper amounting to Rs. 1.00 Cr for C/O approach road and IB at Kanubari/Lawnu submitted to Planning Commission for funding under SPA 2012-13
Remarks
:
Last Updated
: 21-07-2013 02:18am

TOP