Developmental Initiatives

CM's Path-breaking Initiatives... read more

Flagship Programs... read more

Annual Operating Plan (AOP... read more

Prime Minister's Package... read more


Prime Minister's Package

Hon’ble Prime Minister of India Dr. Manmohan Singh  on 31st Jan. 2008, announced in Itanagar that Arunachal Pradesh, Our Land of Rising Sun, will rise from the East... , he struck an instant bond of solidarity with his Arunachali brothers and sisters and series of announcements that he made for various mega infrastructure projects that day launched Arunachal Pradesh onto an unprecedented phase in its development trajectory. The progress on most of the infrastructure development projects like construction of New Secretariat Building and Legislative Assembly Building and connectivity oriented projects like the Trans Arunachal Highway, railway line to Itanagar, 4-lane highway to Itanagar, up-gradation of Advanced Landing Grounds etc. has since been satisfactory. Projects of such magnitude are being implemented for the first time in the State and it is a proud privilege of every Arunachallee to be a part of this golden phase of developmental history of the State.

LIST OF PM PACKAGE

1)    New Secretariat Building

2)    New Assembly Building

3)    Pare Hydroelectric Project (110 MW, NEEPCO)

4)    Dibang Multi-Purpose Project (3000 MW, NHPC)

5)    Itanagar Water Supply Scheme (JNNURM, Completed)

6)    Harmuti-Naharlagun Railway Line Project (21.75 kms)

7)    Electrification of all houses (2121 villages):

         a) Hydro Power Dept : 1325 villages

         b) APEDA : 796 villages (546- Solar power, 250- Micro Hydel)

8)   Greenfieldairport at Itanagar

9)   Operationalization of Tezu, Pasighat, Aalo, Daporijo and Ziro airports

10)   Improvement of ALGs: Tuting, Mechuka, Aalo, Tawang, Walong, Ziro, Vijoynagar and Pasighat

11)  Helicopter connectivity between Tawang and Guwahati

12)  Corpus Fund to R K Mission (allotted)

13)  Connectivity to 513 settlements under Bharat Nirman

14)  Completion of incomplete projects: Rs 455.09 Cr to complete 1262 projects under Roads & Bridges and Power    sectors

15)  Reconstruction of flood damaged infrastructure (Rs 399.20 Cr)

16)  Drinking Water Supply in remote locations

17)  Four-lane highway for Itanagar

18)  Two-lane connectivity to district headquarters

19)  60 Km missing links (bridges & approaches) between NH37 and NH52

20)  Two-laneTrans Arunachal Highway(1574.83 kms)

For more details log on to www.arunachalplan.nic.in

Share this post

  • Submit Prime Minister's Package
  • Submit Prime Minister's Package
  • Submit Prime Minister's Package
  • Submit Prime Minister's Package
  • Submit Prime Minister's Package
  • Submit Prime Minister's Package
  • Email Prime Minister's Package
  • Submit Prime Minister's Package
  • Submit Prime Minister's Package
  • Submit Prime Minister's Package
  • Submit Prime Minister's Package
  • Tweet Prime Minister's Package
TOP